RICS Home Survey Level 1
Formerly known as the Condition Report
Briefly describes the construction and condition of the building, services, grounds and any significant outbuildings, advising also on any areas which your legal advisor should investigate further e.g. guarantees for works, rights of way, planning/building control matters etc. Further advice on repairs and/or ongoing maintenance is not given. The inspection is the least extensive of the three survey types and the report is the most concise. The Condition Report is therefore priced the lowest and is aimed at conventional and newer homes in reasonable condition.
What type of property is this suitable for?
How long will it take for the report to arrive?
We aim to turn around level 1 reports between 2 and 3 working days from the date of inspection
What are the limitations of this survey?
The surveyor will not lift floorboards, floor coverings, open up wall surfaces, move heavy objects or personal effects. The surveyor will, however, utilise tools to assess cracks and measure dampness along with all human senses to identify issues and draw conclusions.
The surveyor will visually inspect services (electrical, gas, water and heating installations) but cannot perform specific tests on these. Where applicable, the surveyor may recommend testing is undertaken by an appropriate specialist for example; a heating engineer.
Additional advice such as a valuation, reinstatement figure can be given at a small additional cost but these are not included as standard
At Smart Home Surveys we can help you with your residential property needs by:
Thank you for your enquiry; you will receive a confirmation email shortly.
In the meantime, please take a look at what we do.
Thank you, Smart Home Surveys.